Marmot Trestles 15F Sleeping Bag Long (Lead / Electric)
Marmot Trestles 15 Sleeping Bag Long
The full-featured Trestles 15 long is a reliable, all-purpose synthetic bag that insulates even in sustained cold and damp conditions while backpacking, trekking and mountaineering.
- Weight: 3 lbs 14 oz. (1765 g) Size: 6" Temperature: 15 F (-9 C)
- Insulation: Spirafil 120
- Classic trapezodial foot box
- Compression stuff sack
- "Feely" and hood draw cord
- Second side zip
- Wave construction
- Velcro-free face muff
- Snagless draft tube
- Two hang loops
MPN: 2387.1161
Brand: Marmot